BeetleOPS services · Cloud

Cloud Infrastructure

Modernise the technology underneath the business, through secure migration and architecture built to scale.

What this is

Secure cloud migration, infrastructure optimisation and scalable architecture design

We modernise the environment your systems run on, and the gains in speed and cost are meant to still be there in three years. Every design starts from what your business is trying to do, not from a reference architecture with your logo dropped on it.

Agile to run. Cheaper to own. Built to last.

  • Migration
  • Architecture
  • Optimisation
  • Security
  • Resilience
  • Cost
Legacy infrastructure with outdated systems, high maintenance costs and data silos, moving through assessment and planning, migration strategy, infrastructure optimisation and scalable architecture design into a modern cloud environment, and ending in operational agility, cost efficiency and long-term digital resilience.
01 / What the work covers

Move it safely, then run it well

Migrate

Secure cloud migration

The sequence, the rollback and the cutover window are agreed before anything moves. The business keeps trading throughout.

Design

Scalable architecture

Sized to how your load actually behaves. A busy month should not cause a panic, and a quiet one should not cost you for capacity nobody used.

Optimise

Infrastructure optimisation

What you already run, made faster and cheaper. There are usually instances, storage tiers and licences nobody has looked at in two years.

Secure

Security and access

Identity, network boundaries, encryption and backups belong in the build. Bolting them on afterwards is how gaps get left.

Resilience

Continuity and recovery

Backups you have restored from. Failover you have tested. A recovery time somebody has actually put a stopwatch on.

Cost

Cost visibility

Spend attributed to the teams and systems generating it. The monthly bill becomes a set of decisions you made on purpose.

02 / How it runs

From the inventory to the cutover

  1. 01

    Assess

    What runs where, what it depends on, what it costs today. Including the box in the corner nobody wants to touch.

  2. 02

    Plan

    What moves, what gets rebuilt, what stays where it is. In an order that keeps you trading while it happens.

  3. 03

    Build

    Stand up the target environment with security, networking and monitoring configured before anything lands in it.

  4. 04

    Migrate

    In stages, with a tested rollback at each one. The old environment stays up until the new one has been checked against it.

  5. 05

    Optimise

    Tune capacity and cost once real load arrives, then keep watching as the workload changes.

Tell us what you are still running on

We will look at what you have, what it costs and what moving it would actually involve.

Talk to us

← All services